Back to the previous photograph
Back to index page 6

Crossing the Danube on a cycle lane suspended under Prater Bridge.
Crossing the Danube on a cycle lane suspended under Prater Bridge.


UTC Time: 10:13, Sunday 11 September 2005
Local Time: 12:13, Sunday 11 September 2005
Estimate of longitude: 16° 26' 3.40" E = 16.434277°
Estimate of latitude: 48° 12' 20.35" N = 48.205652°
Possible error on position estimate: 100 metres