Back to the previous photograph
Back to index page 2

The large structure on the left is the Botlek lifting bridge. There is some major work going on and ...
The large structure on the left is the Botlek lifting bridge. There is some major work going on and the ramp for cyclists to go up to reach it is closed. The scaffolding construction has been built as a replacement but it turns out that that is closed this week as well. I'll have to go back about a mile to the last junction and use a different bridge.


UTC Time: 08:05, Thursday 30 August 2018
Local Time: 10:05, Thursday 30 August 2018
Estimate of longitude: 4° 19' 36.26" E = 4.326740°
Estimate of latitude: 51° 52' 18.08" N = 51.871690°
Possible error on position estimate: 5 metres