Back to the previous photograph
Back to index page 2

The green line through the water is the top of a wall which was constructed to constrain most of the...
The green line through the water is the top of a wall which was constructed to constrain most of the flow of water to the shipping channel so that it stoped the channel silting up.


UTC Time: 20:15, Sunday 01 December 2013
Local Time: 09:15, Monday 02 December 2013
Estimate of longitude: 170° 33' 1.33" E = 170.550370°
Estimate of latitude: 45° 52' 12.68" S = -45.870190°
Possible error on position estimate: 50 metres