Back to the previous photograph
Back to index page 1

According to the sign, this 21 km section of road has been improved at a cost of € 1,682,159.59...
According to the sign, this 21 km section of road has been improved at a cost of € 1,682,159.59 plus tax. That's about £70 per metre, which seems pretty good value when you look at a metre of road and think how much material and effort is required to make it.


UTC Time: 08:25, Thursday 04 August 2011
Local Time: 09:25, Thursday 04 August 2011
Estimate of longitude: 7° 1' 27.95" W = -7.024430°
Estimate of latitude: 40° 36' 4.14" N = 40.601150°
Possible error on position estimate: 5 metres